Estimate for Construction of Retaining wall (10 Mtr. L X 5 Mtr. B ): Rate per Sq.ft Rs.600/-

Estimate for Construction of Retaining wall (10 Mtr. L X 5 Mtr. B ): Rate per Sq.ft Rs.600/-

Estimate for Construction of Retaining wall (10 Mtr. L X 5 Mtr. B) : Rate per Sq.ft Rs.600/-



Name of work: Construction of Retaining wall (10 Mtr. L X 5 Mtr. B )



RECAPITULATION SHEET

 
Sr. No. Detailed of Estimate Amount in Rs.
A Sub Estimate No. 1 (Retaining wall) 2,69,392.50
B Sub Total 1 2,69,392.50
C Add 1% Material Testing & Q.C. 2,693.93
D Add 1% Labour Cess 2,693.93
E Sub Total 2 2,74,780.35
F Add 18% G.S.T (9% CGST & 9% SGST) 49,460.46
G Grand Total Amount in 3,24,240.81
H Area in Sq.mt (10 Mtr. L X 5 Mtr. B ) 50
I Rate Per Sq.mt 6,484.82
J Rate Per Sq.ft 602.68



Cross Section

👇👇👇



Ref Image By Jigar Darbar


Name of Work: Estimate for Construction of Retaining wall at Lake.



 Abstract Sheet for Retaining Wall

 
Sr. No. Description of Item QTY
Unit
Rate Amount in Rs
A Civil works
1
Excavation for foundation up
to 1.5 M depth including sorting
out and stacking of useful
materials and disposing off
the excavated stuff up to
50-meter lead (B) Dense or
hard soil
30.0/
Cmt
85.90 2,577.00
2
Filling available excavated earth
(excluding rock) in trenches.
 plinth, sides of foundations etc.
in layers not exceeding 20 cm.
in depth consolidating each
disposited layer by
ramming and watering.
17.0/
Cmt
76.50 1,300.50
3
Providing and laying cement
concrete 1:3:6 (1-Cement:
3-coarse sand: 6- hand
broken stone aggregates
40 mm nominal size) and
curing complete excluding
cost of form work in
(A) Foundation and Plinth
3.0/
Cmt
2393.00 7,179.00
4
Providing and laying controlled
cement concrete  M.250 and
curing complete including the
cost of form work and excluding
the cost of reinforcement for
reinforced concrete work
in (A) Foundations, footings,
Retaining wall etc.
39.0/
Cmt
4635.00 1,80,765.00
5
Providing TMT Bar FE 500
reinforcement for R.C.C.
work including bending,
binding and placing in
position complete up to
floor two level
1755/
Cmt
44.20 77,571.00
A Total Amount in Rs.
2,69,392.50





Sr. No.

Detailed of Estimate

Amount in Rs.

A

Sub Estimate No. 1 (Retaining wall)

4,02,710.00

B

Sub Total 1

4,02,710.00

 

 

 

C

Add 1% Material Testing & Q.C.

4,027.10

D

Add 1% Labour Cess

4,027.10

E

Sub Total 2

4,10,764.20

 

 

 

F

Add 18% G.S.T

73,937.56

G

Grand Total Amount in ₹

4,84,701.76

 

 

 

H

Area in Sq.mt (10 Mtr. L X 5 Mtr. B )

50.00

I

Rate Per Sq.mt

9,694.10

J

Rate Per Sq.ft

901.00




Sr. No.

Description of Item

QTY

Unit

Rate

Amount in Rs

1

Excavation for foundation up to 1.5 M depth

30

Cu.mt

150

4,500.00

2

Filling available excavated earth (excluding rock) in plinth & foundations etc.

17

Cu.mt

100

1,700.00

3

PCC: Plan Cement concrete 1:3:6 

3

Cu.mt

3600

10,800.00

4

Controlled cement concrete M-25

39

Cu.mt

6200

2,41,800.00

5

TMT Bar FE 500D reinforcement

1755

Cu.mt

82

1,43,910.00

 

Total Amount in Rs.

 

 

 

4,02,710.00